Picture 1 of 1

Gallery
Picture 1 of 1

CEILING FAN CAPACITOR CBB61 5uf+5uf+5uf 5 WIRE Authorized GE and HUNTER
US $7.79
ApproximatelyEUR 6.92
Condition:
New
A brand-new, unused, unopened and undamaged item in original retail packaging (where packaging is applicable). If the item comes direct from a manufacturer, it may be delivered in non-retail packaging, such as a plain or unprinted box or plastic bag. See the seller's listing for full details.
More than 10 available1,037 sold
Oops! Looks like we're having trouble connecting to our server.
Refresh your browser window to try again.
Postage:
Free Standard Shipping.
Located in: Houston, Texas, United States
Delivery:
Estimated between Thu, 15 May and Tue, 20 May to 43230
Returns:
No returns accepted.
Payments:
Shop with confidence
Seller assumes all responsibility for this listing.
eBay item number:160836406721
Item specifics
- Condition
- Brand
- New Tech
- Model
- CBB61
- MPN
- CBB61
Item description from the seller
About this seller
ceilingfancontrols
99.3% positive Feedback•152K items sold
Registered as a private sellerThereby, consumer rights stemming from EU consumer protection law do not apply. eBay buyer protection still applies to most purchases.
Popular categories from this shop
Seller Feedback (37,154)
This item (39)
All items (37,154)
- i***i (40)- Feedback left by buyer.Past monthVerified purchaseItem was as described and worked perfectly. Condition was new. Highly recommend.
- 7***0 (963)- Feedback left by buyer.Past monthVerified purchaseitem as described
- d***r (2669)- Feedback left by buyer.Past monthVerified purchaseGreat seller fast shipping thanks
- -***m (83)- Feedback left by buyer.Past monthVerified purchaseWorka great.
- a***k (14)- Feedback left by buyer.Past monthVerified purchaseWorks fine. not quite the range of the original one that came with the unit but just fine with remote operating all functions
- s***r (57)- Feedback left by buyer.Past monthVerified purchaseBought a second unit as a future backup since I was impressed with the timeliness and performance of the first unit.